The temperature chain system consists of temperature probes, data transmission modules, batteries, solar panels, brackets, enclosures, floats, steel wires, etc. It allows for continuous underwater temperature monitoring and data transmission in unmanned conditions.

Use fixed ropes to fix the floating island on the water surface, and install the main box, bracket, solar panel, battery, transmission module, etc. on the floating island; A temperature chain composed of numerous temperature probes is thrown into the water below the floating island.

There are 3 temperature chains in this project, which are 55 meters, 45 meters, and 40 meters respectively. The underwater temperature measurement is carried out using a layered point setting method. According to project requirements, except for the first and last sensors, a temperature probe should be placed every 3 meters. The data is transmitted wirelessly to the server for users to log in to the platform for browsing, querying, and exporting data.


Installation Process:

1. Float platform assembly

 Assemble the float platform with a total area of 9 square meters (3x3m) using 0.5x0.5m floats.

Installation Process for Temperature Chain.jpg

Installation Process for Temperature Chain.jpg

2.Assemble the solar panel brackets

Complete the assembly of the solar panel brackets on land and securely attach them to the float platform. Then assemble the control box, lightning rod, signal light, and lightning protection wire with the square steel frame and fix them onto the float platform.

Installation Process for Temperature Chain.jpg

Installation Process for Temperature Chain.jpg

3. Temperature sensor assembly

Attach the temperature sensors in sequential order to the cables and apply white silicone gel to prevent loosening. Straighten the steel wires and cables and fasten the temperature sensor casings onto the steel wires using clamps (two clamps for each casing). Let the white silicone gel dry completely, and then place all the sensors on the float platform.

Installation Process for Temperature Chain.jpg

4. Install anchors and anchor chains

 Bring the anchors and anchor chains onto the float platform and securely connect them using U-shaped clamps. Attach two anchor chains to each platform, fixing them in the float's installation side holes (diagonal fixation). Ensure that the bottom end of the steel wire is also firmly connected to the anchor.

Installation Process for Temperature Chain.jpg

Installation Process for Temperature Chain.jpg

5.  Use a boat to tow the float platform to the designated latitude and longitude position.

Installation Process for Temperature Chain.jpg

6. Slide the anchors and anchor chains along the edge of the float platform into the water. 

Place the temperature chain through the center square hole and into the water, ensuring that the cables are not subjected to tension. Then connect the solar panel cables and temperature chain cables to the control box. Test the data transmission to ensure it is functioning properly.

 


Installation Process for Temperature Chain.jpg

7. Installation is complete.

Installation Process for Temperature Chain.jpg

Know more about Temperature Chain:

temperature transmitter RS485, 4-20 mA


CATEGORIES

CONTACT US

Contact:Roxy Deng

Phone:+8617794001501

Tel:+8617794001501

Email:roxy@besteetech.com

Add:Weibin District, Baoji, Shaanxi Province, China

Scan the qr codeclose
the qr code